We opened all 70 scheme pages on CDA’s register and counted. Thirty-six carry an enforcement notice; sixteen of those also show an NOC badge reading “Issued”.
On 2 September 2026 we opened all seventy scheme pages on CDA’s register, one at a time, and counted the enforcement notices attached to them. Thirty-six of the seventy carry at least one. Sixteen of those thirty-six show an NOC badge reading “Issued” at the same time.
Every one of these notices is public — CDA directs its own IT department to upload them “for awareness of the general public”. Almost nobody reads them, because they sit as PDF attachments below a headline badge that usually says Approved.
Read together they are obviously one process, not eight coincidences: the same sections of the CDA Ordinance 1960 (49-C, 46 and 46-B), the same seven- or ten-day compliance windows, the same list of consequences — demolition, sealing of society offices, withholding of utility connections, sale of the plots mortgaged with CDA, and referral to NAB or FIA. Largely the same signing directorate, across schemes with nothing else in common.
Every one of the thirty-six is searchable, with a direct link to CDA’s own PDF, in the Islamabad society checker. Below are the ten we opened and read in full.
The one thing to take from this page. A scheme’s badge on CDA’s register — “LOP Approved, NOC Issued” — is a scheme-level, point-in-time status. It is not a statement that everything being marketed under that name is approved, and it is not a statement that the scheme is currently in compliance. On four of the eight below, the badge was clean while the attachment on the very same page described part of the same development as illegal.
The ten we read, dated
| Notice date | Scheme | What CDA itself alleges |
|---|---|---|
| 30 Sep 2025 | Multi Gardens (B-17), Phase-I Register badge at the time: LOP Approved · NOC Issued | Over 100 Kanal of amenity land — parks, green strips and an 80-Kanal club plot — converted and allotted as numbered residential plots; a grid station, a zoo, a medical centre and houses built on the 300-foot right-of-way of 18th Avenue; the revised layout plan of 10 Mar 2022 never followed by the mandatory revised NOC. CDA’s own notice states the case against the society’s management “is already in FIA Court on similar Violations”. |
| 3 Dec 2025 | CBR Town Register badge at the time: LOP Approved · NOC Issued | CDA states 31.05 Kanal reserved for public buildings in Phase-I was never transferred into CDA’s name as the approval required. Ten days to show cause, against demolition or removal of structures and possible cancellation of the layout plan. |
| 14 Jan 2026 | Bahria Paradise Commercial Scheme-IV Register badge at the time: Bahria Zone-5 entries carry mixed NOC statuses | A 5.20-Kanal conversion of open space to commercial use and an illegal extension, against an outstanding liability CDA puts at Rs 1,842.27 million. Seven-day compliance window, NAB and FIA referral threatened. |
| 16 Mar 2026 | Bahria Enclave Phase-I Register badge at the time: LOP Approved · NOC badge reads “Not Issued” (25 Nov 2025) | A thirty-row compliance table with roughly twenty rows marked “Not Complied”: mortgaged plots allotted, allotment and transfer letters never vetted by CDA, Rs 53.44 million in outstanding dues, roughly half the scheme area developed, and a 3.5 km Jinnah Avenue link road “not developed to date”. |
| 31 Mar 2026 | Bahria Enclave Phase-I (second notice) Register badge at the time: same scheme, same month | CDA states there are two different Layout Plans for the same scheme in its own Regional Planning Directorate record, “quite different from each other”, and a shortfall of more than 200 Kanal in parks and green area. Copied to SECP and to the signatories of both plans. |
| 31 Mar 2026 | Tele Gardens Housing Scheme, F-17 Register badge at the time: LOP Approved · NOC Issued | 🔴 The same allegation, almost word for word, as Bahria Enclave’s notice of the same month: “there are 2 LOPs available in the record… which are quite different from each other”. Sponsor and town planner summoned with the original layout plan and its AutoCAD file. Signed by the same directorate. This is not a Bahria-specific problem. |
| 18 May 2026 | Zaraj Housing Scheme Register badge at the time: LOP Approved · NOC Issued (2005) | A 27.12-Kanal shortfall in the public land the scheme was required to transfer to CDA out of 707.42 Kanal reserved. Ten-day compliance window, with cancellation of the NOC named as the consequence. The scheme’s layout has been revised in 2013, 2020 and 2023 — with no revised NOC since 2013. |
| 25 May 2026 | Gulberg Greens / IBECHS Register badge at the time: LOP Approved · NOC Issued | Construction ordered halted over 8,005 Kanal owed to CDA under a condition attached to the scheme’s own NOC of 3 October 2013. |
| 1 Jun 2026 | Naval Anchorage — Phase-II and Block-A Register badge at the time: the registered 3,702.70-Kanal scheme is Approved / Issued | Two final show-cause notices. CDA states that roughly 5,500 Kanal marketed as “Naval Anchorage Phase-II” and a further 435 Kanal as “Block-A” were developed with no approved layout plan and no NOC, that Block-A land is largely inside another scheme’s approved plan and earmarked for public amenities, and that a named college and university campus stand on the same land. Seven days to demolish. The notice chains back through prior notices to February 2012. |
| 25 Aug 2026 | “Yar Muhammad Scheme”, inside Bani Gala Register badge at the time: not registered at all | A final show-cause notice against an unapproved scheme with no LOP and no NOC, after notices running from 2016 to 2025 went unanswered. Seven-day deadline; construction, marketing and allotment all barred. |
Every row is CDA’s own allegation in its own document, read from cda.gov.pk and its attachments. We are reporting what the regulator says, not adjudicating it. Where a scheme has answered CDA publicly, we have not found that answer — if a sponsor publishes one, we will link it here.
What this changes about “is it CDA approved?”
It makes the question too small. Three better ones, in order:
- Approved when, and revised since? A layout plan revised in 2022 needs a revised NOC. Multi Gardens’ notice says the revision was approved in March 2022 and the revised NOC never obtained — and that under CDA’s own clause the approval then “stands withdrawn automatically”. Zaraj has revised its plan three times since its last NOC.
- Approved what? Naval Anchorage’s badge covers 3,702.70 Kanal. The notices concern roughly 6,000 further Kanal marketed under the same name. Bahria’s Zone-5 entries carry different NOC statuses under one brand. The brand on the signboard is not the unit of approval.
- Is the specific plot inside the approved plan? This is the only question that protects you, and it is answered by the plan, not by the badge. It is also exactly what CDA’s 20 August 2026 directive was for: schemes must display the approved layout plan and status at the booking office, and transfers are restricted to plots inside it.
Two layout plans for the same scheme — twice
In March 2026 CDA told Bahria Enclave’s sponsor that two different Layout Plans for the scheme existed in its own Regional Planning Directorate record, “quite different from each other”. We reported that as a Bahria Enclave story. It is not.
In the same month, the same directorate sent Tele Gardens (F-17) a notice using almost identical wording — “there are 2 LOPs available in the record… which are quite different from each other” — and summoned the sponsor and the town planner with the original plan and its AutoCAD file. When a regulator cannot say which plan is the real one, neither can a buyer. Ask for the plan by its approval date, and ask whether any other version exists.
The pattern inside the pattern: amenity land
Read the notices next to each other and the same act recurs. A park, a green strip, a school plot, an open space — land the plan reserves for everyone — is converted and sold as numbered residential or commercial plots. Multi Gardens: over 100 Kanal, plot numbers listed. Bahria Enclave: a shortfall of more than 200 Kanal in parks and green area. Bahria Paradise: 5.20 Kanal of open space to commercial. Zaraj: 27.12 Kanal never transferred.
Why it matters to a buyer and not just to a planner: CDA’s Multi Gardens notice cites a line of Islamabad High Court and Supreme Court rulings holding that amenity-plot conversions are categorically illegal and that allottees on such plots acquire no protectable right. The plot can be perfectly real, fully paid, and still stand on land the courts say was never sellable.
And one road worth knowing about
CDA also publishes a list of schemes it calls outright illegal — 98 of them. We counted where they are. Forty-five of the 101 sit on the Lehtrar Road / Simly Dam Road corridor — a single belt on the eastern edge of the city. That is not a coincidence of geography; it is where unapproved development is cheapest to start. The corridor has its own page, with the named list.
Every area we have read the record on
Each of these carries the same four things: CDA’s own register badge, any notice attached to it, FBR’s notified value for the area, and live asking prices with a date on them.
DHA Islamabad-Rawalpindi · Naval Anchorage Islamabad · Zaraj Housing Scheme · B-17 Multi Gardens · G-13, G-14 and G-15 · Gulberg Greens & Residencia · Bani Gala · Lehtrar Road & Simly Dam Road · Chak Shahzad · Bahria Town Rawalpindi · Park View City Islamabad
What to actually do with this
- Open the scheme’s page on CDA’s register and scroll past the badge to the attachments. That is where the notices live. Two minutes.
- Ask the seller for the approved layout plan and the current NOC — the revised one, by date. Not the 2008 original.
- Locate your specific plot on that plan before any token. Amenity conversions are invisible from the street; the plan is the only place they show.
- If the scheme is not in either CDA list at all, find out why before assuming the worst: FGEHA sectors, DHA phases and CDA’s own sectors are all legitimately absent, because CDA’s private-scheme regime does not govern them. Absence is only a red flag for a private scheme.
Reading a regulator’s paperwork
It means the scheme, at the scheme level, has an approved layout plan and an NOC on record. It does not mean everything marketed under that name is approved, and it does not mean the scheme is currently in compliance. Between September 2025 and August 2026 CDA served show-cause notices on eight Islamabad developments, and on four of them the register badge read clean while CDA's own attachment on the same page described part of the same development as illegal.
On cda.gov.pk. Open the scheme's page under housing schemes and scroll past the status badge to the attached PDFs — CDA directs its own IT department to upload these notices 'for awareness of the general public and all stakeholders'. The separate illegal-housing-schemes list is published at cda.gov.pk/illegal-housing-schemes. Both are free and take two minutes.
It is when land the approved plan reserves for a park, a green strip, a school or an open space is converted and sold as a residential or commercial plot. CDA's own notices cite High Court and Supreme Court rulings holding that such conversions are categorically illegal and that allottees on those plots acquire no protectable right. So the plot can be real and fully paid and still sit on land the courts say was never sellable — which is why locating your plot on the approved plan matters more than the badge.
Not necessarily, and this is where most people go wrong. FGEHA sectors like G-13 and G-14, DHA's phases, and CDA's own sectors such as F-15 or I-8 are all legitimately absent, because CDA's private-scheme LOP/NOC regime does not govern them — a different authority does. Absence is only a warning sign for a privately sponsored scheme that ought to be there.
Which scheme are you looking at?
Send the name. You get the register badge, the notices attached to it, and a straight answer about the plot in front of you.