Short answer: No list yet: DHA's result page is still 404 as of 11 Sep 2026, 12:03 PKT. How the last two lists came out, the working CNIC checker, and the 30-day clock.
Direct line: Muhammad Hasnain, plot specialist for Bahria Enclave & DHA Margalla Enclave — WhatsApp 0300 0399322. Verified before you pay; drawbacks in writing.
Live status — last checked 11 Sep 2026, 12:03 PKT. NO LIST YET — HTTP 404
DHA’s result page is not switched on — it still answers 404 “Access Denied”. No balloting result list for the 3rd ballot has been published anywhere official. A “list” forwarded on WhatsApp today did not come from DHA.
Is there a Margalla Enclave balloting result list?
As of the timestamp above, no. DHA publishes the 3rd-ballot result on one page, margallaenclave.dhai-r.com.pk/ballot_result/, and that page is not switched on. DHA’s own terms describe how a result reaches you: a per-applicant lookup, an email to the address on your form, and a hard copy by post. Nothing in those terms promises a public PDF of winners. If DHA publishes a list this time, we mirror it here the hour we see it and say exactly where it came from.
Until then, treat every “Margalla Enclave 3rd ballot result list” you are sent — screenshot, PDF, YouTube thumbnail — as unverified. The second ballot produced the same wave of forwarded “lists” before DHA had published anything.
How the last two results came out
Margalla Enclave ballots: window close, draw date and how the result was released| Round | Applications closed | Draw | Gap | How the result came out |
|---|
| 1st ballot | 14 Feb 2025 | 24 Feb 2025 — Jacaranda Family Club, Islamabad | 10 days | Announced at the draw event; checkable on the scheme portal afterwards. |
| 2nd ballot | 10 Nov 2025 (extended once, from 3 Nov) | 20 Nov 2025 — Jinnah Convention Centre | 10 days | Per-applicant lookup on DHA’s checker; successful applicants emailed and posted. |
| 3rd ballot | 4 Sep 2026 (circulated by dealers; never published by DHA) | Not announced | — | This page, the hour it lands. |
Both earlier rounds ran ten days from the close of applications to the draw. That is a pattern, not an announcement: DHA has published no draw date for the 3rd ballot, and no official DHA surface ever published the 4 September closing date either — it traces to dealer pages. The full argument is on the balloting result page.
Check without a list: the working checker
DHA runs a working result checker, and it is not on the URL most people are sent. www.dhai-r.com.pk/margalla-enclave-ballot/ answers 403 behind a bot challenge; drop the “www.” and dhai-r.com.pk/margalla-enclave-ballot/ loads with a live lookup form. It asks for three things:
- Identity type — CNIC, NICOP or POC.
- Identity number.
- Application number in the form DHA M______, printed on the customer copy of your acknowledgement receipt. The 3rd-ballot series starts at M0726. Without that slip the checker cannot be used — call the UAN, 051-111-555-400.
“Balloting live” — what that has meant so far
The first two draws were ceremonies at a venue (Jacaranda Family Club, then Jinnah Convention Centre), with the result released through the portal and by email afterwards. We have found no DHA announcement of a public live stream for the 3rd draw. A “live result” video that is not on a dhai-r.com.pk address is someone else’s commentary, not the result.
If your name is on the list: the clock starts the same day
From DHA’s own 14 August 2026 form — the amount due within 30 days of the ballot:
Amount due within 30 days of the Margalla Enclave ballot, by plot size| Plot | Lump sum 100% within 30 days | Or 20% down 3-year plan |
|---|
| 125 sq yd — 5 Marla | 21,434,375 | 5,000,000 |
| 250 sq yd — 10 Marla | 42,011,375 | 9,800,000 |
| 500 sq yd — 1 Kanal | 72,876,875 | 17,000,000 |
- Miss the deadline and the allotment is cancelled automatically, processing fee forfeited.
- The 2-Year plan’s own table says 27 days while every other plan and Clause 7 say 30 — work to 27 if you are on that plan.
- Corner, boulevard and park-facing plots carry a premium capped at 15% combined, on top of the advertised price.
The exact instalment for every size is on the payment plan page; the winner’s first 30 days are on winners — next steps; and the honest answer for the majority is on unsuccessful — refunds.
Dated log
Newest first. Each entry is a check we ran ourselves, with the time we ran it.
- 2 Sep 2026, 14:10 PKT — Two days to the advertised close. Result page
/ballot_result/ still 404. Two findings today: DHA’s working result checker is live on the bare hostname dhai-r.com.pk/margalla-enclave-ballot/ (the www. version 403s, which is why everyone reports it broken); and no official DHA surface anywhere publishes a closing date for this ballot — portal, parent site, notice gallery and press all checked. Every 4 September date in circulation traces to dealer pages. - 1 Sep 2026, 17:04 PKT — Applications still open; three days to the 4 September deadline. DHA’s result page
/ballot_result/ returns 404 “Access Denied” — it has not been switched on. The scheme portal itself is up. No draw date has been announced anywhere official, and the “November” dates circulating on dealer sites and YouTube are the second ballot’s (20 November 2025), not this one’s. - 28 Aug 2026 — Checked DHA’s portal: the Ballot Result section was locked, with the site’s own wording indicating results are published there and not before. Official 3rd-ballot payment table pulled and transcribed on our payment plan page.
- 14 Aug 2026 — DHA’s application form PDF is created (per the file’s own metadata) carrying the 3rd-ballot price table, the 19 terms and the 20% down payment rule — the figure most competing pages still print as 15%.
Status is polled automatically against DHA’s own URLs and this page is rebuilt when it changes. If you see the list before we do, tell us and we will timestamp your tip.